Following many years of building the Spirovent® reputation by solving what had been considered "routine" maintenance or "inherent" problems in existing buildings, it is now the basis of design in many specifications by the top consulting engineering firms for new construction.  These specifications recognize the Spirovent as an engineered system component that protects the investment in high quality boilers and chillers and allows them to operate more efficiently.  No longer just an air separator installed to match the pipe size as a system accessory, the Spirovent is included as an integral component in the overall system design.  Found in major hotel chains, government and military installations, hotel / casino complexes, civic centers, museums, and many Fortune 500 facilities, the Spirovent sets the standard that all others try to achieve. 

Related Work

Potawatomie Bingo Casino - Milwaukee, WI
Two custom fabricated 20" high velocity air eliminators.
Kansas State University - Manhattan, KS
Following the installation of numerous smaller units on campus that met all expectations, a separator upgrade was proposed for the central plant.
North Mississippi Medical Center - Tupelo, MS
High velocity 18" combination air eliminator and dirt separator.
South Point Hotel, Casino & Spa - Las Vegas, NV
Custom fabricated 24" high velocity combination air eliminator / dirt separator for the hot water system and custom fabricated 30" high velocity air / dirt for chilled water.