Following an on-site system review, the first two Spirovents were installed in an equipment room serving two residence halls with recurring problems.  Positive results were immediate and since that time The University of Delaware has become one of our largest higher-ed customers.  Beyond the academic, research, and residence halls there is a 16" combination air dirt unit installed in the Laird Plant to replace an undersized centrifugal during the plant renovation and a custom fabricated 30" combination unit in the ECUP.

Related Work

Kansas State University - Manhattan, KS
Following the installation of numerous smaller units on campus that met all expectations, a separator upgrade was proposed for the central plant.
Air Eliminator Piping
Install the Spirovent® at the point of lowest solubility, which is the place in the system where the temperature is the highest and pressure the lowest.
University of Michigan - Ann Arbor, MI
Replacing the old style centrifugal separator after two years of unsatisfactory system performance, the Spirovent solved the problems within two months.
Cottey College - Nevada, MO
From the President's house to the power plant, to almost all buildings on campus, Spirovents have contributed to efficient system performance across the campus.