Following an on-site system review, the first two Spirovents were installed in an equipment room serving two residence halls with recurring problems.  Positive results were immediate and since that time The University of Delaware has become one of our largest higher-ed customers.  Beyond the academic, research, and residence halls there is a 16" combination air dirt unit installed in the Laird Plant to replace an undersized centrifugal during the plant renovation and a custom fabricated 30" combination unit in the ECUP.

Related Work

Waukesha Memorial Hospital
The Spirovent was selected and installed to prevent dirt and sediment in the existing system from reaching a new addition and improvements went even beyond that.
Mercy Medical Center - Des Moines, IA
High velocity 18" combination air eliminator and dirt separator.
Dirt Separator Piping
Install the Spirotrap® typically ahead of the system component being protected, such as the boiler in this drawing.
South Point Hotel, Casino & Spa - Las Vegas, NV
Custom fabricated 24" high velocity combination air eliminator / dirt separator for the hot water system and custom fabricated 30" high velocity air / dirt for chilled water.